When a certificate needs a new version
| Trigger | Source |
|---|---|
| The certificate is updated, for example after retesting | CPSC Quick Start Guide |
| A new batch has a material change: product design, manufacturing process or source of component parts | CPSC Quick Start Guide; 16 CFR 1107.23 |
| A new batch is made at a different facility or tested at a different lab | CPSC Quick Start Guide |
| Edits after the 48-hour editing grace period | Registry User Guide v3.0 |
| Edits to a record already used in a message set within the grace period | CPSC Quick Start Guide |
The 48-hour grace period
After a record is certified, users have 48 hours to edit it; CPSC says the period may change. Edits within the window require the record to be certified again, which restarts the 48 hours. After the window, or once the record has been used in a Reference message set, a change needs a new Version ID (Registry User Guide v3.0).
How often children's products are retested
| Option | Maximum interval | Rule |
|---|---|---|
| Periodic testing plan | At least once a year | 16 CFR 1107.21(b) |
| Production testing plan | At least once every two years | 16 CFR 1107.21(c) |
| Testing by an ISO/IEC 17025 accredited lab | At least once every three years | 16 CFR 1107.21(d) |
All periodic testing must be done by a CPSC-accepted third-party lab (16 CFR 1107.21(a)). The interval can be set by time, units produced or another method, as long as the maximum is not exceeded.
Material changes
If a children's product's design, manufacturing process or component sourcing changes in a way that could affect compliance, the changed product or part must be retested by a CPSC-accepted lab and a new CPC issued (16 CFR 1107.23(a)). Changes that make a rule stop applying are not material changes.
Keeping versions straight
The broker must file the Version ID that matches the goods on the entry. When a new version is certified, send the broker an updated hand-off sheet before the next shipment of that product.