Import CertsGet a quote

When does a CPSC certificate need a new version or a retest?

A new Version ID is needed after retesting, a material change, a new factory or lab, or edits after the Registry's 48-hour grace period. Children's products must be retested by a CPSC-accepted lab at least once a year under a periodic testing plan, or every two or three years under the production testing or ISO/IEC 17025 options.

Reviewed November 2026. Checked against 5 sources, listed at the end of the page.

When a certificate needs a new version

TriggerSource
The certificate is updated, for example after retestingCPSC Quick Start Guide
A new batch has a material change: product design, manufacturing process or source of component partsCPSC Quick Start Guide; 16 CFR 1107.23
A new batch is made at a different facility or tested at a different labCPSC Quick Start Guide
Edits after the 48-hour editing grace periodRegistry User Guide v3.0
Edits to a record already used in a message set within the grace periodCPSC Quick Start Guide

The 48-hour grace period

After a record is certified, users have 48 hours to edit it; CPSC says the period may change. Edits within the window require the record to be certified again, which restarts the 48 hours. After the window, or once the record has been used in a Reference message set, a change needs a new Version ID (Registry User Guide v3.0).

How often children's products are retested

OptionMaximum intervalRule
Periodic testing planAt least once a year16 CFR 1107.21(b)
Production testing planAt least once every two years16 CFR 1107.21(c)
Testing by an ISO/IEC 17025 accredited labAt least once every three years16 CFR 1107.21(d)

All periodic testing must be done by a CPSC-accepted third-party lab (16 CFR 1107.21(a)). The interval can be set by time, units produced or another method, as long as the maximum is not exceeded.

Material changes

If a children's product's design, manufacturing process or component sourcing changes in a way that could affect compliance, the changed product or part must be retested by a CPSC-accepted lab and a new CPC issued (16 CFR 1107.23(a)). Changes that make a rule stop applying are not material changes.

Keeping versions straight

The broker must file the Version ID that matches the goods on the entry. When a new version is certified, send the broker an updated hand-off sheet before the next shipment of that product.

Want the certificate records built for you?

We set up your CPSC Product Registry account, build a certificate record for each product from your test reports, and give your broker the identifiers. Setup is $1,500 for up to 25 products.