| Rule | 16 CFR 1500.17(a)(13) |
|---|---|
| Covers | Candles with metal-cored wicks |
| Certificate | General Certificate of Conformity (GCC) |
| Third-party testing | Not required to be third party: a test of each product or a reasonable testing program |
| eFiling citation code | 1500.17(a)(13) |
| In force since | October 15, 2003§ 1500.17(a)(13)(i) |
| CPSC import estimate | 2,616 importers, 27,843 filings a year90 FR 1800, Table 15 |
What the rule covers
16 CFR 1500.17(a)(13) applies to candles with metal-cored wicks. Its scope provision reads:
Candles manufactured or imported on or after October 15, 2003, made with metal-cored candlewicks, unless:§ 1500.17(a)(13)(i), eCFR
| Term | Definition in the rule | Section |
|---|---|---|
| Outer container or wrapper (candles) | the term “outer container or wrapper” does not include the immediate container in which candle(s) is/are intended to be displayed at retail or during use in the home, unless that container or wrapper is also the only container or wrapper in which the candle(s) is/are shipped to a retailer. | § 1500.17(a)(13)(i)(B) |
What the rule requires
| Requirement | Section |
|---|---|
| The metal core of each wick may contain no more than 0.06% lead by weight of the metal core. | § 1500.17(a)(13)(i)(A) and (ii)(A) |
| Every outer shipping container or wrapper of such candles, including shipments to retail outlets, must carry the conformity statement. | § 1500.17(a)(13)(i)(B) |
| Metal-cored wicks sold on their own are covered by the same lead limit and shipping-container labeling. | § 1500.17(a)(13)(ii) |
The required wording, verbatim:
Conforms to 16 CFR 1500.17(a)(13).16 CFR 1500.17(a)(13)
Which certificate, and who tests
CPSC's list of rules requiring a General Certificate of Conformity names “Metal-cored candlewicks” (16 CFR 1500.17(a)(13)). The eFiling code list of December 18, 2025 marks 1500.17(a)(13) as a GCC rule. For general-use products CPSC says a GCC rests on a test of each product or a reasonable testing program, and first-party testing or any qualified lab can support it, so a CPSC-accepted lab is not required.
CPSC's 2013 proposal on certificates (78 FR 28080), the guidance its GCC list cites for bans, lists this ban in Table A as one that needs a GCC.
CPSC's own eFiling burden estimate in the 2025 final rule (90 FR 1800, Table 15) counts 2,616 importers of candles with metal-cored wicks filing 27,843 certificates a year, all of them GCCs.
When it took effect
| What | Date | Source |
|---|---|---|
| Ban applies to candles and wicks manufactured or imported on or after | October 15, 2003 | § 1500.17(a)(13)(i) |
| Final rule effective | October 15, 2003 | 68 FR 19142 (DATES) |
What goes in the eFiling record
Each entry carries the certificate data in a Full PGA Message Set or as a Reference to a certified record in the CPSC Product Registry, citing code 1500.17(a)(13) plus a code for every other rule the product is certified to. See the seven certificate data elements.
Data: this citation is a row in the Import Certs CPSC Certificate Rule Lists 2026.11, free as CSV and JSON under CC BY 4.0.
Common questions
Do imported candles with metal-cored wicks need a CPC or a GCC?
A General Certificate of Conformity. CPSC's eFiling code list marks 1500.17(a)(13) as a GCC rule, and third-party testing is not required.
What is the CPSC eFiling citation code for 16 CFR 1500.17(a)(13)?
1500.17(a)(13), from CPSC's eFiling citation code list dated December 18, 2025. List it with a code for every other rule the product is certified to.
How much lead can a candle wick core contain?
No more than 0.06 percent lead by weight of the metal core (16 CFR 1500.17(a)(13)).
- 16 CFR 1500.17(a)(13) (eCFR, current)
- 68 FR 19142, April 18, 2003, Metal-Cored Candlewicks Containing Lead and Candles With Such Wicks
- CPSC, Rules Requiring a General Certificate of Conformity
- CPSC proposed rule, Certificates of Compliance, 78 FR 28080, May 13, 2013 (Table A: bans that need a GCC)
- CPSC eFiling Citation and Testing Exclusion Codes, December 18, 2025 (xlsx)
- 16 CFR part 1110, Certificates of Compliance (eCFR, current)
- CPSC final rule, Certificates of Compliance, 90 FR 1800, January 8, 2025